Skip to content

DS 251 Practice Center

Using one synthetic campus building, trace a meter reading, apply a data contract to three data variants, and hand over a daily energy KPI package that someone else can recompute.

Info

All practice data is synthetic teaching data (data version power-demo-v1): Building A, meter A01 and every reading were generated for this course and describe no real building, campus energy use or audit result. The case deliberately has no emission factor and no inventory boundary, so it cannot support any Scope 2 figure.

Warning

Classroom output is a teaching review record. Code and AI tools may compute and draft; a person defines the rules, recomputes the numbers, records the decision and remains accountable. Professional assurance of sustainability information (for example under IAASB ISSA 5000) is carried out only by qualified practitioners under the applicable standards, and nothing in this course replaces it.

Warning

Use only the synthetic files provided by the course, and use your learner code instead of your real name. Never paste company secrets, client personal data, real meter or tenant data, or other unauthorised sensitive information into an AI tool or practice environment.

Download the practice files

Meter readings, variant F1 (CSV)

DS251_Meter_Readings_F1.csv

Both periods for meter A01 at 15-minute intervals, with one resent reading and one value reported in Wh. Columns: reading_id, building_id, meter_id, interval_start, value, unit, received_at.

Download

Meter readings, variant F2 (CSV)

DS251_Meter_Readings_F2.csv

The same base data with one reading removed from the comparison period, for the missing-interval test.

Download

Meter readings, variant F3 (CSV)

DS251_Meter_Readings_F3.csv

The same base data with a second, different value for one interval in the comparison period, for the conflict test.

Download

Meter registry (CSV)

DS251_Meter_Registry.csv

Meter A01 mapped to Building A, 15-minute intervals, time zone Asia/Taipei and the metric definition electricity_kwh_per_15min_interval.

Download

Comparison periods (CSV)

DS251_Periods.csv

Baseline period B (9 to 16 November 2026) and comparison period C (16 to 23 November 2026), start included and end excluded, with building, meter, time zone and metric definition.

Download

KPI pipeline notebook (ipynb)

DS251_KPI_Pipeline.ipynb

A pre-filled notebook using only the Python standard library: validate, normalise, deduplicate, compute daily KPIs and coverage, compare periods, and write the handoff package. Set VARIANT to F1, F2 or F3.

Data dictionary (Markdown)

DS251_Data_Dictionary.md

Every field of the input and output files, the quality rules Q01 to Q08 with severity and action, the versions, and the time-zone and interval conventions.

KPI Evidence Handoff Package template (Markdown)

DS251_Handoff_Template.md

The ten fields of artifact 201-A1 with guidance, the scoring rubric (M1 10, M2 15, M3 15) and a peer-recompute checklist, to draft before you submit the online form.

Exercises

Exercise 1: Trace a Meter Reading

Draw the AIoT flow for Building A and trace one reading from the meter to its row in the data file, naming one transmission risk.

Files used: Meter readings, variant F1 (CSV), Meter registry (CSV), Data dictionary (Markdown)

Steps

  1. Draw the flow: meter, gateway, MQTT broker, ingestion and downstream use, with one box per component.
  2. On each arrow write one thing that can go wrong: resend, delay, unit mix, missing interval or wrong meter mapping.
  3. Draft the fields one reading needs, one line each, and compare them with the header of DS251_Meter_Readings_F1.csv.
  4. Pick one row and trace it: meter and building (checked against the registry), interval start and end in local time, value in kWh, and one risk.
  5. Find R-B-0101 and R-B-0101-RESEND and explain in one sentence why the interval is counted once.

What you produce

  • A flow diagram with one risk on each arrow
  • A draft field list with meanings
  • One traced reading with meter, interval, kWh value and risk

Info

Hand-drawn diagrams are fine; take a photo or redraw it in any tool. Do not use real meter data from your workplace.

Exercise 2: Data Contract and Quality Checks

Write the data contract, run the notebook (or the spreadsheet fallback) on F1, F2 and F3, and decide for each variant whether the result is kept, observed only, or blocked.

Files used: KPI pipeline notebook (ipynb), Meter readings, variant F1 (CSV), Meter readings, variant F2 (CSV), Meter readings, variant F3 (CSV), Data dictionary (Markdown)

Steps

  1. Write the contract: logical key (meter_id, interval_start), time zone, interval convention, accepted units and the Wh to kWh rule.
  2. Run the notebook with VARIANT = 'F1' and check that both periods have 672 of 672 valid intervals, then read the Q05 and Q06 rows in the quality log.
  3. Run F2: find the Q08 gap, the affected day, its coverage and status, and the period C coverage and observed total.
  4. Run F3: find the Q07 conflict, the affected day and why its observed_kwh is empty; write a short review request for a person.
  5. Fill in the decision table: for F1, F2 and F3, the rules found, period C coverage, and keep, observe only or block, with a reason.

What you produce

  • A written data contract
  • The quality log for each variant
  • A decision table for F1 to F3 with reasons

Info

If Python will not run, open the CSV in a spreadsheet: sort by interval_start, look for repeated keys, divide Wh values by 1,000 and count intervals per day. Never fill a gap or resolve a conflict by guessing.

Exercise 3: KPI Table and Evidence Handoff

Produce the daily KPI table, chart, evidence index and handoff manifest, have another group recompute two numbers, and submit the KPI Evidence Handoff Package.

Files used: KPI pipeline notebook (ipynb), Comparison periods (CSV), KPI Evidence Handoff Package template (Markdown), Meter readings, variant F1 (CSV)

Steps

  1. From your F1 run, check the period totals (B 1,000.00 kWh, C 900.00 kWh) and compute the change only after confirming every comparability condition.
  2. Draw daily kWh for both periods on an axis starting at zero, label any partial or blocked day in text, and add the values as a table.
  3. Check that evidence-index.csv links every daily KPI row to its source reading ids, data version and transform version.
  4. Write handoff-manifest.json with schema_version, data_version, transform_version, package_origin set to student, and the file list.
  5. Swap packages with another group, trace and recompute one daily KPI and one period total, and record the result and who checked it.

What you produce

  • daily-kpi.csv, quality-log.csv, evidence-index.csv, periods.csv and handoff-manifest.json
  • A chart with a text alternative and status labels
  • A peer-recompute record and a short statement of limits

Info

The change is an arithmetic difference; do not attribute it to any measure. Scope 2 is out of scope because the case has no emission factor. Submit the 10-field form on the Apply page; if your files do not fit, upload them to the campus LMS and reference them in the form.

The done mark is stored in this browser only (and synced once you join a session). Keep your work in your own files.

Sync my progressJoin a session to keep progress across devices and share it with your instructor

Info

After you join, your completed lesson numbers are sent to your instructor together with your learner code, so they can see your progress. Use the codes your instructor gave you or the email you sign in with, and do not enter your name, company secrets or other personal data. Progress is kept with the rest of that session's data.

What next?