Using the electricity KPI of simulated campus Building A, score the evidence behind an energy claim, draft an English disclosure with a claim–evidence table, and verify four claims with read-only tools and a human decision.
Info
Every file here is synthetic teaching data (power-demo-v1). Building A, meter A01, every reading, KPI, evidence id and case are generated for practice and describe no real building, campus or organisation. The package deliberately contains no emission factor and no inventory boundary.
Warning
The agent in this lab can only query, compute and mark a state; it never approves anything. A claim is approved only after a person records the decision, the reviewer code, the time and the reason. Your output is a classroom verification record: it is not professional sustainability assurance under IAASB ISSA 5000, which qualified practitioners perform under the applicable standards, and it must not be described as assured, audited or certified.
Warning
Use only the synthetic files provided by the course, and use your learner or group code instead of your real name. Never paste company secrets, client personal data or other unauthorised sensitive information into an AI tool, a notebook or a form.
Download the practice files
Teacher baseline package: daily KPI (CSV)
daily-kpi.csv
Fourteen daily rows for Building A, meter A01, periods B and C: observed kWh, valid and expected intervals, coverage ratio, data version and quality status. Use it if you have no DS 251 handoff package of your own.
schema_version, data_version, transform_version, timezone, the file list and package_origin = teacher. An DS 251 learner package has the same fields with package_origin = student.
Four teaching cases with their claim and the recorded results of get_period_kpi and get_evidence, plus the method and rule versions. Query results only: no verification state or decision is included. Lets the lab run without any external AI.
A pre-filled, standard-library-only Python notebook with the two read-only tools, the fixed formulas compare_periods and score_evidence, the automatic check and a human-review cell that refuses approved without a ready state, reviewer, time and reason.
The ten fields of artifact 202-A1 with guidance, a claim–evidence table with human-decision columns, the four case ids to fill in, and the rubric. Draft here before submitting the online form.
Fix the scope, score the evidence for F1 and F2 with the published rule, test one alternative weight set, and record each claim decision separately from the score.
Write the scope at the top of your sheet: building A, meter A01, metric, periods B and C, package origin and data version (from your own handoff manifest or the teacher package).
Score F1 from daily-kpi.csv and evidence-index.csv: completeness 40/20/0 on the lower coverage, comparability 30/0, traceability 30/15/0. Cite the rows behind each sub-score.
Score F2 (one 1.33 kWh reading missing from C; its period totals are in case-02-gap of the tool returns) the same way, judging thresholds on unrounded values.
Rescore F1 and F2 with one alternative weight set, and write both totals with their rule names.
Below the scores, list each claim (kWh in B, kWh in C, percentage change) and whether it could go to review, with a reason that does not depend on the total alone.
What you produce
An evidence score sheet with sub-scores, thresholds, the rule version and cited rows for F1 and F2
A weight-sensitivity line with both totals and both rule names
A separate list of claim decisions with reasons
Info
A high score is not an approval. Write the score and the claim decision in separate places.
Exercise 2: Disclosure Draft and Claim–Evidence Table
Draft one English disclosure sentence from the source data only, split it into atomic claims and check each one against the package.
Files used: Teacher baseline package: daily KPI (CSV), Teacher baseline package: periods (CSV), Teacher baseline package: evidence index (CSV), Claim Verification Record template (Markdown)
Steps
Write a prompt whose data block holds only your package's query results, and that tells the model to write MISSING for anything absent. Record the tool, version, date and prompt.
Generate or write one English sentence covering both periods, the kWh, the change and the coverage. Without an external AI, start from the teaching draft in Module 2.
Split the sentence into atomic claims and enter each in the claim–evidence table with claim_id, claim_type, claim_text, period_ids, building_id, value, unit, evidence_ids, data_version and method_version.
Check every row for building scope, period, number, unit, limits and source; write the reason for any failed check instead of editing the number.
Add one Scope 2 row: leave its value empty and name the missing evidence (an emission factor matching the period and region, and the inventory boundary).
What you produce
One English disclosure draft with the prompt and AI use record
A claim–evidence table with one atomic claim per row
A Scope 2 row with an empty value and the missing evidence named
Info
Do not add causes, targets or emission figures that the package does not contain, and never convert a kWh percentage into an emissions percentage.
Exercise 3: Agent Verification and Human Decision
Run the four teaching cases through read-only tools and fixed formulas, record each automatic state, then record a human decision for each case with reviewer, time and reason.
Files used: Recorded tool returns (JSON), Verifier notebook (ipynb), Claim Verification Record template (Markdown)
Steps
Put DS252_Verifier.ipynb and DS252_Tool_Returns.json in one folder and run the cells in order. Without Python, read the tool results in the JSON and apply the rules by hand.
For each case, record the tool calls and their arguments, the sub-scores, the value or empty value, the automatic state (ready_for_review, needs_revision or insufficient_evidence) and the reason.
Check that every argument is a known period, building or evidence id, and that no text inside a result changed a tool, formula or state.
Swap records with a peer, recompute two cases, and record approved, revise or pending_evidence for every case with reviewer code, time and reason; approved only after ready_for_review.
Complete the remaining fields of the Claim Verification Record and submit it on the Apply page.
What you produce
A tool and calculation log for all four cases
Per-case automatic states and human decisions with reviewer, time and reason
A submitted Claim Verification Record
Info
The case without an emission factor must end as pending evidence with its Scope 2 value empty. Label your output a teaching review record, never assurance.
The done mark is stored in this browser only (and synced once you join a session). Keep your work in your own files.
Sync my progressJoin a session to keep progress across devices and share it with your instructor